Health & Safety 4 a) Mechanical and electrical components b) Controls for critical pieces of lifting or rigging equipment c) Crane cables and all lifting attachments d) Structural components of the hoist, brakes, wheels, hooks, hook-blocks and rails e) Load limiting devices, safety devices, limit switches and control systems required for individual equipment e.g.

Lifting and hoisting Lifting equipment includes lifting appliances ... For complex/critical/tandem lifting operations the lift plan is prepared and reviewed by an assured qualified engineer. Date .

Details of Loads . c) ... written procedures and risk assessment require otherwise. A risk assessment is not about creating huge amounts of paperwork. It is the purpose of this document to provide guidance during the assessment of each equipment lifting operation, and to aid him in the safe execution of his contract obligations. Issued by : Appointed Person carrying out the Assessment: Date of Assessment: Contact: Phone: Fax: Site contact: Phone: Fax: Description of lift: NB 50% reduction in load capability if man basket is used. / / Rev . Risk ranking is firstly performed based on the unmitigated risk for each hazard, and then the level of risk is re- evaluated after taking into consideration of the existing prevention/mitigation measures and controls. Project . Risk ranking is firstly performed based on the unmitigated risk for each hazard, and then the level of risk is re- evaluated after taking into consideration of the existing prevention/mitigation measures and controls. Hazard identification and risk assessment are an integral part of planning a lift. Guidance on Critical Ventilation System Risk Assessment Process and Factors This guidance document has been produced to provide assistance to healthcare professional with responsibilities for the management, maintenance and use of critical ventilation systems.

Critical Lifts – Lifts which require the completion of a documented risk assessment and formal Critical Lift Plan to ensure the protection of employees, and to reduce the risk of loss to the business when cranes and lifting equipment are utilized for the purpose of hoisting materials, machinery, plant equipment, and personnel under specific hazardous conditions. Site/location : Client . 3. TERMS OF REFERENCE Mr. Roscoe Nel of Integrated Safety and Health Systems (Pty) Ltd conducted a Health and Safety Risk Assessment based on scope of works set out, site visit and approved architectural … Project . Instead, it will help you consider all the possible risks in the workplace and the ways you can keep people safe from these risks. STFC Lifting Plan, Risk Assessment and Method statement . Separate rigger allotted for lifting operation. An assessment of the lift and determination of the lift method, equipment and number of people required are critical to planning of the lift. Issued by : Appointed Person carrying ... Risk Assessment and Method Statement and that I accept the duty of ensuring that the lift(s) will be carried out in Once the risk assessment is complete, the project manager will signoff on the plan and the plan moves to approved. VI.

A lift plan is required for every lift. To create a well rounded risk assessment, you will need to go through a series of steps to then write the assessment. Control. 8. Critical Lift The lifting of special high dollar, one-of-a-kind articles such as spacecraft, aircraft, aircraft parts, or support equipment whose loss would have serious programmatic impact. Scope This procedure applies to all operations involving the use of Cranes, Lifting Gear, Hoists, Fork Lifts and Telescopic Material Handlers. Figure 6.3 TPL SHE Risk Assessment Matrix (RAM) RISK MATRIX Very Likely - 5 5 10 15 20 25 Likely - 4 4 8 12 16 20 Critical lifts routinely performed in high risk operating environments, such as plants, refineries, and pressurized piping areas, should have related job standards or operation procedures modified to include approved ‘blanket’ Critical Lift Plans that specify required rigging for repetitive jobs. STFC Lifting Plan, Risk Assessment and Method statement .